How We Built Simone's

Gutting the Interior

One of the first steps toward building Simone's was gutting out the interior and getting the space ready for the interior build-out.

 

 

 

 

 

This picture looks toward the front of the building along the west wall.

 

The garage seemed more spacious once the old vehicles and detritus were removed.

 

Two patterns of tin ceiling were present on either side of the first floor. The original building undoubtedly hosted two different storefronts; Simone's now occupies both spaces. This picture looks toward the back of the building along the east wall.

 

This photo depicts the tin ceiling on the west side of the first floor.

 

This photo shows the tin ceiling on the east side of the first floor.

 
Simone's - Web design graphic
Simone's - Web design graphic
Simone's - Web design graphic
Simone's header graphic
Simone's is open
daily from
11:30 a.m.

to 2 a.m.